Overhead cost variance is:


A) The difference between the overhead costs actually incurred and the overhead budgeted at the actual operating level.
B) The difference between the actual overhead incurred during a period and the standard overhead applied.
C) The difference between actual and budgeted cost caused by the difference between the actual price per unit and the budgeted price per unit.
D) The costs that should be incurred under normal conditions to produce a specific product (or component) or to perform a specific service.
E) The difference between the total overhead cost that would have been expected if the actual operating volume had been accurately predicted and the amount of overhead cost that was allocated to products using the standard overhead rate.

F) B) and E)
G) C) and D)

Correct Answer

verifed

verified

Direct materials variances are called price and quantity variances. However, when referring to direct labor, these variances are usually called _________________ and _____________ variances.

Correct Answer

verifed

verified

Rate; Efficiency

Chips Co. assigned direct labor cost to its products in May for 1,300 standard hours of direct labor at the standard $8 per hour rate. The direct labor rate variance for the month was $200 favorable and the direct labor efficiency variance was $150 favorable. Prepare the journal entry to charge Goods in Process Inventory for the standard labor cost of the goods manufactured in May and to record the direct labor variances. Assuming that the direct labor variances are immaterial, prepare the journal entry that Chips would make to close the variance accounts.

Correct Answer

verifed

verified

Bok Company's output for the current period was assigned a $400,000 standard direct labor cost. The direct labor variances included a $10,000 unfavorable direct labor rate variance and a $4,000 favorable direct labor efficiency variance. What is the actual total direct labor cost for the current period?


A) $414,000.
B) $386,000.
C) $394,000.
D) $406,000.
E) $410,000.

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

D

The difference between the flexible budget sales and the fixed budget sales is called the __________________________ variance.

Correct Answer

verifed

verified

Sales volu...

View Answer

How are unfavorable variances recorded? How are favorable variances recorded?

Correct Answer

verifed

verified

Unfavorable variance...

View Answer

The standard materials cost to produce 1 unit of Product M is 6 pounds of material at a standard price of $50 per pound. In manufacturing 8,000 units, 47,000 pounds of material were used at a cost of $51 per pound. What is the total direct materials cost variance?


A) $48,000 unfavorable.
B) $51,000 favorable.
C) $51,000 unfavorable.
D) $3,000 favorable.
E) $3,000 unfavorablE.

F) B) and C)
G) A) and B)

Correct Answer

verifed

verified

Differences between actual costs and standard costs are known as __________________. These differences may be subdivided into _________________ and ________________.

Correct Answer

verifed

verified

Cost Variances (or j...

View Answer

When computing a price variance, the price is held constant.

A) True
B) False

Correct Answer

verifed

verified

The following information comes from the records of Dina Co. for the current period. a. Compute the overhead controllable and volume variances. In each case, state whether the variance is favorable or unfavorable. b. Prepare the journal entries to charge overhead costs to goods in process and the overhead variances to their proper accounts. The following information comes from the records of Dina Co. for the current period. a. Compute the overhead controllable and volume variances. In each case, state whether the variance is favorable or unfavorable. b. Prepare the journal entries to charge overhead costs to goods in process and the overhead variances to their proper accounts.   Factory overhead (based on budgeted production of 24,500 units) Variable overhead $2.25/direct labor hour Fixed overhead $1.95/direct labor hour Factory overhead (based on budgeted production of 24,500 units) Variable overhead $2.25/direct labor hour Fixed overhead $1.95/direct labor hour

Correct Answer

verifed

verified

A favorable variance for a cost means that when compared to the budget, the actual cost is ____________________ than the budgeted cost.

Correct Answer

verifed

verified

Manatee Corp. has developed standard costs based on a predicted operating level of 352,000 units of production, which is 80% of capacity. Variable overhead is $281,600 at this level of activity, or $0.80 per unit. Fixed overhead is $440,000. The standard costs per unit are: Manatee Corp. has developed standard costs based on a predicted operating level of 352,000 units of production, which is 80% of capacity. Variable overhead is $281,600 at this level of activity, or $0.80 per unit. Fixed overhead is $440,000. The standard costs per unit are:   Manatee actually produced 330,000 units at 75% of capacity and actual costs for the period were:   Calculate the following variances and indicate whether each variance is favorable or unfavorable: (1) Direct labor efficiency variance: $__________________ (2) Direct materials price variance: $__________________ (3) Controllable overhead variance: $__________________ Manatee actually produced 330,000 units at 75% of capacity and actual costs for the period were: Manatee Corp. has developed standard costs based on a predicted operating level of 352,000 units of production, which is 80% of capacity. Variable overhead is $281,600 at this level of activity, or $0.80 per unit. Fixed overhead is $440,000. The standard costs per unit are:   Manatee actually produced 330,000 units at 75% of capacity and actual costs for the period were:   Calculate the following variances and indicate whether each variance is favorable or unfavorable: (1) Direct labor efficiency variance: $__________________ (2) Direct materials price variance: $__________________ (3) Controllable overhead variance: $__________________ Calculate the following variances and indicate whether each variance is favorable or unfavorable: (1) Direct labor efficiency variance: $__________________ (2) Direct materials price variance: $__________________ (3) Controllable overhead variance: $__________________

Correct Answer

verifed

verified

Explain variance analysis. Describe how variance analysis assists managers.

Correct Answer

verifed

verified

Variance analysis compares actual result...

View Answer

The difference between the actual cost incurred and the standard cost is called the:


A) Flexible variance.
B) Price variance.
C) Cost variance.
D) Controllable variance.
E) Volume variance.

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

C

Identify the four steps in the budgetary control process.

Correct Answer

verifed

verified

The four steps are: (1) develop the budg...

View Answer

Fixed budgets are also known as flexible budgets.

A) True
B) False

Correct Answer

verifed

verified

A flexible budget performance report compares the differences between:


A) Actual performance and budgeted performance based on actual sales volume.
B) Actual performance over several periods.
C) Budgeted performance over several periods.
D) Actual performance and budgeted performance based on budgeted sales volume.
E) Actual performance and standard costs at the budgeted sales volume.

F) C) and E)
G) A) and C)

Correct Answer

verifed

verified

A cost variance is the difference between actual cost and standard cost.

A) True
B) False

Correct Answer

verifed

verified

The difference between the actual overhead cost incurred and the standard overhead applied is the _________________________.

Correct Answer

verifed

verified

Overhead c...

View Answer

During November, Heim Company allocated overhead to products at the rate of $26.00 per direct labor hour. This figure was based on 80% of capacity or 1,600 direct labor hours. However, Heim Company operated at only 70% of capacity, or 1,400 direct labor hours. Budgeted overhead at 70% of capacity is $38,900, and overhead actually incurred was $38,000. What is the company's volume variance for November? (Indicate whether the variance is favorable or unfavorable)